学术论文代表作
1 Zeng, N.*, Liu, Y., & König, M. (2023). 4D BIM-Enabled Look-Ahead Scheduling for Early Warning of Off-Site Supply Chain Disruptions. Journal of Construction Engineering and Management (ASCE), 149(1), 04022154. (SCI Q1,一作,通讯)
2 Zeng, N.*, Ye, X., Liu, Y., & König, M. (2023). BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment. Engineering, Construction and Architectural Management. (SCI Q2,一作,通讯)
3 Zeng, N., Liu, Y.*, Gong, P., Hertogh, M., & König, M. (2021). Do right PLS and do PLS right: A critical review of the application of PLS-SEM in construction management research. Frontiers of Engineering Management, 8, 356-369. (FMS高质量期刊,一作)
4 Liu, Y., Zeng, N.*, Papadonikolaki, E., Maritshane, K., & Chan, P. W. (2024). The future of digitalized project practices through data-savvy talent: A digital competence formation perspective. Project Leadership and Society, 5, 100120. (IPMA期刊,二作,通讯)
5 Lin, Y. H., Niu, D., Guo, Y., & Zeng, N.* (2023). The effects of project uncertainty on guanxi governance and contractual governance. Engineering, Construction and Architectural Management. (SSCI, SCI Q2,通讯)
6 Ye, X., Zeng, N.*, & König, M. (2022). Systematic literature review on smart contracts in the construction industry: Potentials, benefits, and challenges. Frontiers of engineering management, 9(2), 196-213. (FMS高质量期刊,二作,通讯)
7 Du, T., Zeng, N., Huang, Y., & Vejre, H. (2020). Relationship between the dynamics of social capital and the dynamics of residential satisfaction under the impact of urban renewal. Cities, 107, 102933. (SSCI,二作)
8 Lin, Y. H., Zheng, R., Wu, F., Zeng, N., Li, J., & Tao, X. (2024). Blockchain-driven framework for financing credit in small and medium-sized real estate enterprises. Journal of Enterprise Information Management. (SSCI)
9 Du, Y., Yuan, J., Wang, S., Liu, Y., & Zeng, N. (2024). Leveraging blockchain to anchor information for supervision in PPP projects: a conceptual framework. Engineering, Construction and Architectural Management. (SSCI, SCI Q2)
10 曾凝霜, 刘琰, & 徐波. (2015). 基于 BIM 的智慧工地管理体系框架研究. 施工技术, (10), 96-100. (北大核心,中国知网《学术精要数据库》领域高引排名前0.1%)
11 Ye, X., Zeng, N., Liu, Y., & König, M. (2023). Smart Contract-Enabled Construction Claim Management in BIM and CDE-Enhanced Data Environment. In International Conference on Construction Logistics, Equipment, and Robotics (pp. 40-47). Cham: Springer Nature Switzerland.(最佳会议论文,德国慕尼黑)
12 Zeng, N., König, M., & Teizer, J. (2017). Off-Site Guarding: Look-Ahead Supply Scheduling for Risk Indication With BIM. In 25th Annual Conference of the International Group for Lean Construction (IGLC) (pp. 877-884).(国际精益建造大会IGLC工程信息化创新贡献奖,Autodesk赞助)
13 Zeng, N., Dichtl, M., & König, M. (2017). A scenario-based simulation framework of on- and off-site construction logistics. In 2017 Winter Simulation Conference (WSC) (pp. 2348-2359). IEEE. (国际学术会议报告,美国)
14 Zeng, N., König, M., Liu, Y., & Xu, B. (2015). Supply chain modeling for BIM-oriented construction schedule management: CODP-based classification approach. In Proc. of the 32nd CIB W78 Conference (pp. 800-809). (国际学术会议报告,荷兰)
15 Ye, X., Zeng, N., & König, M. (2022). Visualization of blockchain-based smart contracts for delivery, acceptance, and payment process using BIM. In IOP Conference Series: Earth and Environmental Science, 1101(4), 042013. (国际学术会议报告,英国)